SOLWAKE

Services

Engineering Solutions for Subsea Cable and Offshore Operations

/01

Initial Laying Operation

Initial Laying Operation is the core phase of submarine cable installation, where cables are deployed across predefined routes with high precision and control. Our team utilizes advanced cable laying techniques and real-time monitoring systems to ensure accurate placement, optimal tension management, and minimal environmental impact. This process is executed under strict operational standards to ensure long-term system reliability.

Scope Includes:

  • Cable deployment and laying operations
  • Route alignment and positioning control
  • Tension monitoring and adjustment
  • Integration with subsea infrastructure

/02

Cable System Repair and Maintenance

We provide comprehensive repair and maintenance services to ensure the continuous performance and reliability of submarine cable systems. Our capabilities include both preventive maintenance and emergency repair operations, allowing us to quickly identify issues, minimize downtime, and restore full functionality in critical situations.

Scope Includes:

  • Fault detection and diagnostics
  • Emergency repair response
  • Preventive maintenance programs
  • Performance monitoring and optimization

/03

Pre-Lay Grapnel Run (PLGR)

Pre-Lay Grapnel Run (PLGR) is conducted to clear seabed obstructions prior to cable installation. Using specialized grapnel equipment, we ensure that any existing debris, fishing gear, or abandoned infrastructure is removed from the cable route. This process significantly reduces installation risks and ensures smoother cable deployment operations.

Scope Includes:

  • Grapnel operation and seabed sweeping
  • Removal of abandoned cables and debris
  • Route conditioning prior to installation
  • Risk reduction for cable laying operations

/04

Post-Lay Inspection & Burial (PLIB)

Post-Lay Inspection & Burial (PLIB) ensures that installed cables are properly positioned, protected, and secured beneath the seabed. This process includes detailed inspection, verification, and burial activities to protect cables from environmental exposure and external interference, ensuring long-term system durability.

Scope Includes:

  • Cable inspection and verification
  • Cable burial and protection
  • Post-installation assessment
  • Long-term system security enhancement

Workflow

Our Operational

Workflow

Our operations are structured through a systematic and integrated workflow that ensures efficiency, precision, and reliability at every stage of the submarine cable lifecycle.

  1. Survey & Route Engineering

We begin by conducting detailed seabed surveys and route analysis to determine the most optimal and secure cable path, ensuring minimal environmental impact and operational risk.

  1. Route Clearance & PLGR

The selected route is prepared through clearance and grapnel operations to remove obstacles and ensure a safe pathway for cable installation.

  1. Initial Cable Laying

Cables are deployed with high precision using advanced laying techniques, ensuring accurate positioning and stable installation across subsea environments.

  1. Post-Lay Inspection & Burial

After installation, the cable is inspected and secured beneath the seabed to protect it from external risks and ensure long-term durability.

  1. Maintenance & Repair

Ongoing maintenance and repair services are conducted to preserve system performance, quickly resolve issues, and ensure uninterrupted connectivity.

Fleet

Advanced Vessels Supporting Subsea Cable Operations

A modern fleet engineered to deliver precision, reliability, and efficiency across submarine cable installation, maintenance, and offshore operations.

#1

Cable Laying Vessel

Engineered for precision submarine cable installation

#2

Submarine Vehicle

Advanced subsea systems supporting inspection

Contact

Ready to Power The Future of Global Connectivity?

Let’s collaborate to deliver reliable submarine cable installation, offshore operations, and subsea infrastructure solutions.

EXPLORE FLEET

CONTACT OUR TEAM

Seamless Worldwide

Connectivity

©2026Solwake. All rights reserved.

marketing@solwake.com

Home

About

Services

Fleet

Project

News

Contact

Services

Engineering Solutions for Subsea Cable and Offshore Operations

/01

Initial Laying Operation

Initial Laying Operation is the core phase of submarine cable installation, where cables are deployed across predefined routes with high precision and control. Our team utilizes advanced cable laying techniques and real-time monitoring systems to ensure accurate placement, optimal tension management, and minimal environmental impact. This process is executed under strict operational standards to ensure long-term system reliability.

Scope Includes:

  • Cable deployment and laying operations
  • Route alignment and positioning control
  • Tension monitoring and adjustment
  • Integration with subsea infrastructure

/02

Cable System Repair and Maintenance

We provide comprehensive repair and maintenance services to ensure the continuous performance and reliability of submarine cable systems. Our capabilities include both preventive maintenance and emergency repair operations, allowing us to quickly identify issues, minimize downtime, and restore full functionality in critical situations.

Scope Includes:

  • Fault detection and diagnostics
  • Emergency repair response
  • Preventive maintenance programs
  • Performance monitoring and optimization

/03

Pre-Lay Grapnel Run (PLGR)

Pre-Lay Grapnel Run (PLGR) is conducted to clear seabed obstructions prior to cable installation. Using specialized grapnel equipment, we ensure that any existing debris, fishing gear, or abandoned infrastructure is removed from the cable route. This process significantly reduces installation risks and ensures smoother cable deployment operations.

Scope Includes:

  • Grapnel operation and seabed sweeping
  • Removal of abandoned cables and debris
  • Route conditioning prior to installation
  • Risk reduction for cable laying operations

/04

Post-Lay Inspection & Burial (PLIB)

Post-Lay Inspection & Burial (PLIB) ensures that installed cables are properly positioned, protected, and secured beneath the seabed. This process includes detailed inspection, verification, and burial activities to protect cables from environmental exposure and external interference, ensuring long-term system durability.

Scope Includes:

  • Cable inspection and verification
  • Cable burial and protection
  • Post-installation assessment
  • Long-term system security enhancement

Workflow

Our Operational

Workflow

Our operations are structured through a systematic and integrated workflow that ensures efficiency, precision, and reliability at every stage of the submarine cable lifecycle.

  1. Survey & Route Engineering

We begin by conducting detailed seabed surveys and route analysis to determine the most optimal and secure cable path, ensuring minimal environmental impact and operational risk.

  1. Route Clearance & PLGR

The selected route is prepared through clearance and grapnel operations to remove obstacles and ensure a safe pathway for cable installation.

  1. Initial Cable Laying

Cables are deployed with high precision using advanced laying techniques, ensuring accurate positioning and stable installation across subsea environments.

  1. Post-Lay Inspection & Burial

After installation, the cable is inspected and secured beneath the seabed to protect it from external risks and ensure long-term durability.

  1. Maintenance & Repair

Ongoing maintenance and repair services are conducted to preserve system performance, quickly resolve issues, and ensure uninterrupted connectivity.

Fleet

Advanced Vessels Supporting

Subsea Cable Operations

A modern fleet engineered to deliver precision, reliability, and efficiency across submarine cable installation, maintenance, and offshore operations.

#1

Cable Laying Vessel

Engineered for precision submarine cable installation

#2

Submarine Vehicle

Advanced subsea systems supporting inspection

Contact

Ready to Power The Future of Global Connectivity?

Let’s collaborate to deliver reliable submarine cable installation, offshore operations, and subsea infrastructure solutions.

EXPLORE FLEET

CONTACT OUR TEAM

Seamless Worldwide

Connectivity

SOLWAKE is a trusted partner in submarine cable installation, maintenance, and offshore engineering services. Supporting global connectivity through reliable subsea infrastructure solutions across the Asia-Pacific region.

©2026Solwake. All rights reserved.

Terms of Service

Privacy Policy

marketing@solwake.com

Home

About

Services

Fleet

Projects

News

Contact

marketing@solwake.com

Home

About

Services

Fleet

Projects

News

Contact

Services

Engineering Solutions for Subsea Cable and Offshore Operations

/01

Initial Laying Operation

Initial Laying Operation is the core phase of submarine cable installation, where cables are deployed across predefined routes with high precision and control. Our team utilizes advanced cable laying techniques and real-time monitoring systems to ensure accurate placement, optimal tension management, and minimal environmental impact. This process is executed under strict operational standards to ensure long-term system reliability.

Scope Includes:

  • Cable deployment and laying operations
  • Route alignment and positioning control
  • Tension monitoring and adjustment
  • Integration with subsea infrastructure

/02

Cable System Repair and Maintenance

We provide comprehensive repair and maintenance services to ensure the continuous performance and reliability of submarine cable systems. Our capabilities include both preventive maintenance and emergency repair operations, allowing us to quickly identify issues, minimize downtime, and restore full functionality in critical situations.

Scope Includes:

  • Fault detection and diagnostics
  • Emergency repair response
  • Preventive maintenance programs
  • Performance monitoring and optimization

/04

Pre-Lay Grapnel Run (PLGR)

Pre-Lay Grapnel Run (PLGR) is conducted to clear seabed obstructions prior to cable installation. Using specialized grapnel equipment, we ensure that any existing debris, fishing gear, or abandoned infrastructure is removed from the cable route. This process significantly reduces installation risks and ensures smoother cable deployment operations.

Scope Includes:

  • Grapnel operation and seabed sweeping
  • Removal of abandoned cables and debris
  • Route conditioning prior to installation
  • Risk reduction for cable laying operations

/05

Post-Lay Inspection & Burial (PLIB)

Post-Lay Inspection & Burial (PLIB) ensures that installed cables are properly positioned, protected, and secured beneath the seabed. This process includes detailed inspection, verification, and burial activities to protect cables from environmental exposure and external interference, ensuring long-term system durability.

Scope Includes:

  • Cable inspection and verification
  • Cable burial and protection
  • Post-installation assessment
  • Long-term system security enhancement

Workflow

Our Operational

Workflow

Our operations are structured through a systematic and integrated workflow that ensures efficiency, precision, and reliability at every stage of the submarine cable lifecycle.

  1. Survey & Route Engineering

We begin by conducting detailed seabed surveys and route analysis to determine the most optimal and secure cable path, ensuring minimal environmental impact and operational risk.

  1. Route Clearance & PLGR

The selected route is prepared through clearance and grapnel operations to remove obstacles and ensure a safe pathway for cable installation.

  1. Initial Cable Laying

Cables are deployed with high precision using advanced laying techniques, ensuring accurate positioning and stable installation across subsea environments.

  1. Post-Lay Inspection & Burial

After installation, the cable is inspected and secured beneath the seabed to protect it from external risks and ensure long-term durability.

  1. Maintenance & Repair

Ongoing maintenance and repair services are conducted to preserve system performance, quickly resolve issues, and ensure uninterrupted connectivity.

Fleet

Advanced Vessels Supporting

Subsea Cable Operations

A modern fleet engineered to deliver precision, reliability, and efficiency across submarine cable installation, maintenance, and offshore operations.

#1

Cable Laying Vessel

Engineered for precision submarine cable installation

#2

Submarine Vehicle

Advanced subsea systems supporting inspection

Contact

Ready to Power The Future of Global Connectivity?

Let’s collaborate to deliver reliable submarine cable installation, offshore operations, and subsea infrastructure solutions.

EXPLORE FLEET

CONTACT OUR TEAM

Seamless Worldwide

Connectivity

SOLWAKE is a trusted partner in submarine cable installation, maintenance, and offshore engineering services. Supporting global connectivity through reliable subsea infrastructure solutions across the Asia-Pacific region.

©2026Solwake. All rights reserved.

Terms of Service

Privacy Policy